CHAPEL OF THE VALLEY

Chapel of the Valley was a combination new-build and remodeling project of an existing residential home that needed to be re-zoned and adapted into the new home of the Chapel of the Valley Funeral Home and services center in East Wenatchee. Forte was involved at every level of the project from design, construction and interiors, FF&E packages.

There were many different things to consider in this project given that every customer coming to this facility is experiencing some form of a hardship. It was critical that we work very closely with the owner of the facility to make sure that color palettes, fabrics, wood tones and all materials were chosen with comfort and stability in mind.

This was a very humbling project to work on and one that we feel very honored to have been able to be a part of. It stretched our interiors threshold as well to work with different design schemes and needs as well.

 
  • LOCATION: East Wenatchee, WA
    TYPE: Commercial, Adaptive Reuse
    DATE COMPLETED: Mid 2020

  • GENERAL CONTRACTOR: Rimmer & Roeter Construction
    STRUCTURAL ENGINEER: Eric Dann, BTL Engineering
    CIVIL ENGINEER: Dave McCarthy, Forsgren